Rain and Drain – Pop-Up Overflow Day

This week’s theme is water, sort of. Saturday we had what I hope is our last snow storm of the year. We woke up to about four inches of snow, which is a very depressing thing to wake up to in April when you’re hoping to see leaves and blossoms.

The snow quickly gave way to rains to day, which did a great job of flooding the front meadow and parts of our yard. Basically our land is all wetlands, so when it rains, it gets wet out there. It’s actually interesting to watch the water flow across the land. It feeds off of adjacent properties, channels its way across our land,comes together in the east meadow and it all ends up in a wet weather creek, heading to a pond on a neighbor’s parcel of land. Eventually it all flows into the Cuyahoga River, then to Lake Erie. Generally speaking its all very interesting to watch, and doesn’t cause any great concern to the house or our landscape.

Inside we’re having a tougher time managing where the water is going.

There’s a leak, or leaks rather, coming from beneath the kitchen sink. No idea what’s wrong but it’s leaking from the top of the garbage disposal. With a big PVC drain pipe leading out of the disposal, I have zero desire to try and fix it myself, so the plumber is coming out tomorrow to see what’s going on and hopefully fix it. Also hopefully, we will not have to replace the garbage disposal. Knowing my luck though, we will and I’m sure it won’t be cheap. I’m past the point of thinking I’ll ever catch a break or get ahead money-wise. Life is playing a cruel trick on me for the last five years I believe.

In the master bath we are now on our third set of drains for the sinks. Originally our $800 Kohler faucets both broke: the stop pulls on both, constructed of cheap nylon snapped in half. The only reason I mention the price is because I don’t feel like something that expensive should break or be so poorly designed. Kohler told us to go pound salt basically, from what I recall, as there was no fix or remedy for their poor design. I don’t recall if there was even a replacement part, but now I look on their site and there are replacement parts (see picture below). Presumably they are of the same crappy material and design.

Well my fix to the problem was to replace the drain with a pop-up drain like we have in our vessel sink in the half bath. A pop-up drain is activated by pushing down on the drain head to engage and disengage it, blocking or allowing water to go through the drain. No need to pull on a stopper attached to the faucet like regular sink and faucet set-ups. Pop-ups are primarily for vessel sinks that don’t have overflows and usually have fancy faucets without lever or pull stops attached to them.

Here was our first attempt – which resulted in giant pop-up drains that were more appropriate for a tub, and the second attempt which looked a lot better.

Turns out the second attempt was wrong too. I ordered drains that didn’t have an overflow. At the time I didn’t know I needed to, but apparently they come two ways. For vessel sinks you don’t need an overflow. It’s just a vessel, if you leave the faucet on the sink overflows onto the floor and just like in the cartoons, comedic hilarity ensues as your house is flooded. The other kind of drain has a rectangle cut into it to accept the overflow water, which comes from sinks that have an overflow hole; that little hole below the faucet in the sink that you always wondered what it was for when you were a kid. We were wondering why water was pooling in our overflow holes. After three years we finally decided to ask the plumber when he was our installing something else. That’s when I learned about the rectangular overflow hole and the need to order the right part for the job.

So I ordered new drains for the master bathroom for the….fourth time technically. $16 apiece on Amazon.com. Which is cheaper than the $80 I spent last round on the Moen units. At least my mistakes are getting cheaper, right?

We’ll get the new ones installed tomorrow. And hopefully at least that one annoyance will be fixed. One less monkey on my back.

Below are images of the new drain, the exploded view of the faucet (I guess I could keep ordering replacement nylon rods for $3 apiece, and keep breaking them) and a diagram that came with the new chrome pop-up overflow drain assembly.

I’ll have a driveway update later this week as I wrap up my research. Until then, stay dry and well drained my readers.

-c

Advertisements

Spray Foam For -15 Days

Winter is kicking the crap out of us. And it’s everything our energy-efficient house can do to keep up. School is cancelled tomorrow because the high is supposed to be around 4 degrees, and lows around -15 degrees.

A weak in our super insulated house that I noticed recently is down in the basement. There are a series of penetrations in the rim joist where various mechanical systems go outside. These include holes for a spigot, the fresh air energy exchanger and what I think is the septic tank.

When they built the house nearly three years ago, the insulation was sprayed first, then the plumber and HVAC guys came in to set up their systems. Well when they did their job, they cut away the insulation but never bothered to spray foam around the pipes. Thus creating a kink in our insulating armor.

Recently when we had the spigot replaced (twice), due to leakage, more foam was removed from that particular hole and not replaced.

When I was finishing off the basement shelves this winter, I noticed I could see cobwebs near the holes blowing in the wind. Air was rushing into the house through the uninsulated penetrations. Because the house is super tight (or is supposed to be), any air penetration is exaggerated. So it was like little jet streams of air pouring in, and recently 0 degree air.

I was going to wait until the weather warmed up to spray some foam into the openings. I’m not sure if the cold air will affect the curing of the foam, as it hardens into an air tight barrier. But with -15 facing us tomorrow I figured I’d better spray today.

I used one can, and sprayed around all the openings. The foam takes a while to expand and harden, so I’ll check progress in the morning, and likely pick up another can to spray. There were a couple other little areas, like where a HVAC register is smack dab against the rim joist, that could use some foam.

When spraying, take your time. These areas are really tight to access, and a flashlight is necessary to be able to see. And don’t be like me: wear gloves. I got the nasty stuff on my hands and in the fur on my arms. It does not come off!

Overall the house has been holding up to winter in terms of keeping us warm. My office area is fairly cold and I’ve taken to plugging in a space heater. I’m also getting old and can’t seem to shake the cold anymore. We’ve been using the pellet fireplace a lot more this winter too. It works like a dream. One other note, the passive solar part of our home building equation definitely works. The kitchen, dining, family room area gets unto 75+ degrees on sunlight alone, which presumably takes some load off of the HVAC system.

I hope you’re all staying as warm as you can. I’m really depressed with the weather we’re having and can not wait for spring to get here as soon as possible.

Here are today’s pics. Peace.

Spray foam comes in a can. It's one time use, so use the whole can.

Spray foam comes in a can. It’s one time use, so use the whole can.

Pipes for the geothermal or septic system. Really tight access to where they penetrate the rim joist.

Pipes for the geothermal or septic system. Really tight access to where they penetrate the rim joist.

The input or output, I forget, for the fresh air heat exchanger. Fairly good access. Note, the laundry room HVAC vent in the adjacent bay is right against the rim joist, and could benefit from some spray foam.

The input or output, I forget, for the fresh air heat exchanger. Fairly good access. Note, the laundry room HVAC vent in the adjacent bay is right against the rim joist, and could benefit from some spray foam.

spray-foam-around-house-penetrations

Cleaning The Roof Washers

I forced myself to take some time over the holiday weekend to get some chores done outside. I cut the grass and weeds around the yard so we can walk around out there again. And I planted the lavender plants finally. Harvested some veggies too.

For all the trouble I had two ticks attached to me in as many days. Gross.

One other task I finally got off my list was cleaning the roof washers on top of the cistern. You’re supposed to clean them every six months. This is the first time I’ve attempted to clean them in the two years we’ve lived here. I’m not one for maintenance I guess. As I said, maintenance is for people who have time on their hands.

The water’s been tasting funny lately so I figured I’d better take a look. Honestly, the water still tastes funny after cleaning them so that may not necessarily be the problem. Well none of us has developed a brain parasite yet so I guess all is well. Maybe a raccoon died inside the cistern itself.

For the un-initiated, the roof washers are big fiberglass boxes that sit upon the cistern and filter all the rain water coming off of the roof. The water flows through a wire screen to take out any pieces of leaves or whatnot. Then the water collects in a big space beyond these screens and slowly filters through a big cotton like filter and down into a pipe that empties into the cistern.

Here’s a good diagram so you’ll kind of know what I’m talking about (click here).

(I don’t know why we have two roof washers, but maybe because of our roof size, or maybe one is a “pre-filter”. I guess I should know.)

Well when I opened them up I could see all kinds of muck and moss and stuff growing in there, which probably isn’t good for anyone’s health. It being two years since I was given my washer cleaning lesson I was sort of winging it. It turned out to be mildly gross but simple enough job; taking about two hours to perform.

First off I pulled out the screens from both washer boxes. They were clogged, but easily hosed off and set in the sun to dry and be sterilized by natural UV rays.

Next I pulled the cotton like filters, in their wire mesh cages. Some of the tops of the filters were blown off. Not sure why, but maybe that happened last year when the drain pipe was clogged during the big rain storm. Anyway, I pulled the filters and all the ancillary component and washed them off with a hose by the driveway. I pulled out the filter elements and unrolled them. With the hose on “jet” mode I rinsed them off and laid them out to dry a little in the sun as well.

(As I’m writing this, I guess I should actually replace the filters, so I’ll call around tomorrow to see where I get those at. Even after cleaning they’re pretty gross still.)

I pulled the bottom plates out of the washer as well. The one had a whole ecosystem growing on it. But everything cleaned up nicely.

(I guess I should have hosed the inside out too, or something like that. I know the pipe going into the cistern has some muck in it. Like I said though, we haven’t gotten any brain parasites or diarrhea yet so I bet it’s all good. I mostly drink beer these days for hydration, just to be safe though.)

I then reinstalled everything in reverse order and we should be good for another two years….er, six months.

I even bought some tan-colored UV protecting spray paint for the top of the fiberglass washer boxes. Sunlight degrades raw fiberglass so it helps to paint the panels. I was supposed to do that two years ago too. Better late than never right? I’m not sure why they just don’t paint them in the factory, but probably no one thought to do that. Now that I have the paint I bet I’ll have them painted by this time next year.

Elsewhere, not much going on. I’ve given up on the tadpole puddle in the driveway. We got a second batch of tadpoles, but the puddle is rapidly evaporating. We need rain. I can’t stay ahead of the disappearing water.

The bees are doing great. We purchased our extracting equipment but have not found the time to assemble it and start extracting honey. I need to get wood to make a solar melter soon as well. Exciting. We’ll be selling honey soon enough. I guess the going price per pound now, retail, is over $6. I’d guess we’ve got between 30-50 lbs of honey waiting to be extracted.

All three hives have queens, so everyone in need has re-queened themselves already this year. Hive No. 2 is very aggressive compared to docile hive No. 3 (the white hive I call it because their comb and honey is pure as driven snow). I had my black gloves on and must’ve been stung ten times. I finally had to take a time out and change gloves to get the bees off of me. Dark hive No. 1 has an awesome new queen who’s laid a ton of eggs and they are making honey at a fast rate.

Okay, here are tonight’s pics. Enjoy.

Gallery Wall Is Painted And The Master Sinks Hate Me.

Well with my birthday over, and my offroading trip finished too, we’ve started this week by settling back into the groove. And as such I have set aside the time to write and let you know what we’ve been up to.  Absolutely nothing productive is happening outside. I just don’t look out the windows at the plant bed that still needs fabric and mulch. Nor do I look at the gum trees that need freedom from the encroaching meadow around them.  And don’t even get me started on the back yard and garden.

Inside though we’re taking baby steps. We pretty much are done painting the upstairs hall “gallery” wall. Here’s what it looked like before, painted Canvas Tan (SW7531):

The hall gallery wall before in tan.

The hall gallery wall before in tan.

We left the rest of hall that color, but for the gallery wall which runs a long way from studio to bedrooms, we wanted something darker to camouflage the closet door cut lines, hinges and door knobs. Also the dark color would make artwork “pop” when hung on that wall. Looking at our Global Spice palette of colors we selected Sherwin Williams GS18 Sable SW6083 which is a dark brown color that goes perfectly with the sage carpet and the aforementioned Canvas Tan.

I thought we’d only need a gallon to cover the 7′ tall wall that runs around…I don’t know….twenty feet long?  And surprise, surprise I was right. Because the walls were already tan we didn’t need to prime them, and two coats of brown did the job. We just have to hit the door edges and closet edges with one more coat and the job will be done. Eventually we’ll replace all the outlets on the wall with brown ones to hide those too.

The gallery wall being painted Sherwin Williams GS18 Sable SW6083.

The gallery wall being painted Sherwin Williams GS18 Sable SW6083.

Do we like it? You’re darn right we like it, a lot.  It provides visual complexity to the space and helps close in the hallway a little, making it more “homey”. And no it’s not too dark at all. Despite not having any windows in the hallway, the space gets enough daylight leaking in from all the adjacent rooms that natural light is not a problem during the day. At night it’s a more engaging space, with a new level of complexity that makes it more interesting. I liken it to a theater set, in that there is a lot more going on visually; an eclectic mix that suits our aesthetic preferences.  This is the second time we’ve painted interior walls in dark brown and we loved it each time. In our old house the entry AND back hall were a nearly black brown and it was fantastic.

Okay, so we banged out that painting project (good ’cause the paint was sitting for like 2 months since we bought it).  Check! No more “paint the hall” monkey on my back. One minor monkey project is the window cranks. The overpriced, but necessary, cranks ($30 a pop!) showed up this week. That means I just need to go around to each window, install cranks where they are missing, and tighten the set screws on ALL the cranks. Then…voila! No more hand crank monkey on my back either.  Only took me 18 months.  Not bad considering my track record for accomplishing things.

While I was emboldened to get things off my list I called up the plumber to check on the Master Bed sinks. As you may or may not know, the little rods you pull to close the drain broke off our overpriced Kohler faucets the first time we used them.  It’s a horrifically (sp?) bad design. I plan on writing Kohler a strongly worded letter asking why they design such garbage and then charge people upwards of $800-$1,000 retail per faucet. The plumber and the sink supplier both tried to get Kohler to provide a fix but the company couldn’t; basically they said “tough shit, there’s nothing wrong with our product” and left us hanging. Well I discovered we had a slick push button drain stop in our half bath sink.  Only took me 18 months to figure that out too. It looks like this:

This is a Kohler push button drain, but apparently it's only available with the nickel faucet in our half bath, not as a stand alone part in chrome.

This is a Kohler push button drain in our half bath.  Yeah, that’ll work.

Well I asked the plumber / plumbing supplier if we could just put these cook push button stops in our Master sinks. Problem solved: push button stops and we’d just glue the old drain stops in place so they looked good but didn’t function. Take that Kohler.  Without looking at anything the plumber and supplier decided I could get two push button stops, and the plumber would split the cost with me; they were $40 a pop. I said “that’s fine” ’cause I just wanted the sink drain monkey off my back. I’ll save my fight with Kohler for another day.

So the plumber came out and changed the drains. I didn’t see them because we had to run the boys to school. When I got back I didn’t think to look at them since I was super busy with work I had to get to. I paid the plumber as he explained something about needing a washer to connect a pipe or something to the new drains….okay, whatever I’m sure it’s fine…I don’t have time to learn all the nuances of being a plumber. It’s tough enough being a neurotic, self-absorbed, design prick…let alone a plumber too. Off the plumber went.

Well nature called so I decided to go check out the drains, expecting to see what you see in the above photo, just chrome.  This is what I saw:

This is ridiculous. Going from bad to worse with our Master Bathroom.

This is ridiculous. Going from bad to worse with our Master Bathroom.

Our new giant push button drains look stupid.

Our new giant push button drains look stupid.

I didn’t even know where to begin. All I could see was this giant chrome thing, about the size of a hubcap on a ’53 Mercury in the middle of our sinks, sticking up like a toadstool that small fairies would hide under during fairy hunting season.

“Wow” I thought.

“Those look big, even for a trashy LA mansion, let alone our humble bathroom. Who thought that was a good idea?” I said to my indifferent brown hand towel who witnessed the entire transformation with nary a word.

Ugh, I don’t have time for this.

For shits and giggles I looked underneath the sink to see what was up down there. I chuckled a little bit. On one sink a nut is holding up the drain pipe. On the other it’s a cutoff of copper tube holding that one up. Apparently the plumber couldn’t readily make the connection between drain and pipe so they’re just sort of squished together, propped up by the random bits.

I don't even know why I bother anymore. Here you can see a nut permanently holding up the drain pipe under the sink because something or anther doesn't bond together properly.

I don’t even know why I bother anymore. Here you can see a nut permanently holding up the drain pipe under the sink because something or anther doesn’t bond together properly.

Ugh, I don’t have time for this.

I called up the plumbing supplier and asked him if Kohler made any push button drains like the one in the half bath. They don’t. They sell that one ONLY with that faucet.  Lovely. Of course that is how they do it. A product someone wants, so don’t offer it. Marketing genius. He did inform me that Moen sells something that will work. I did not ask why didn’t we use that part to begin with. No sense asking the universe unanswerable questions. And no, no returns on the drains that were just installed. So after another $80 out of my pocket, I have two of these ordered:

Moen push button drain. We have two on order for $40 apiece.

Moen push button drain. We have two on order for $40 apiece.

I’ve called my other plumber and he said he’d install them once I get them. I told him, even if we have to take everything back to the wall, I want the pipes done properly. No matter the cost.  I think I’ve done more remodelling projects in our new home than I ever did in our last house that we lived in for a decade. I don’t even argue anymore, I just go with the flow.  Get it?  I “go with the flow“. Plumbing humor.

Going back to the upstairs hall, now that it’s painted I started dreaming about the lighting in there. For now it’s just boring ceiling lights. But the staircase is screaming for a nifty chandelier to add an eclectic charge to our theater like brown and tan hallway.  It looks boring now:

Staircase...bookshelves on the left (back) wall and chandelier from ceiling...someday.

Staircase…bookshelves on the left (back) wall and chandelier from ceiling…someday.

Eventually we want to cover the back wall in a shallow bookcase. And cascading down in front of that bookcase, above the landing, sprouting form the current light location, I’m thinking a really cool glass ball or industrial light fixture.  This is the sort of thing I have in mind:

Stainless ball chandelier.

Stainless ball chandelier.

Awesome pipe fitting chandelier from Restoration Hardware.

Awesome pipe fitting chandelier from Restoration Hardware.

Elegant glass ball pendant chandelier.

Elegant glass ball pendant chandelier.

Barn Light Electric offers this simple multi bulb chandelier.

Barn Light Electric offers this simple multi bulb chandelier.

Meteor shower glass ball chandelier.

Meteor shower glass ball chandelier.

Cool rustic ball chandelier.

Cool rustic ball chandelier.

Very cool pipe fitting lighting.

Very cool pipe fitting lighting.

Something like the ‘meteor shower’ or stainless ball chandelier would look perfect there. The space is so vertical, a light fixture that takes advantage of the space will do wonders for the stairwell and hallway. It’s such an asymmetrical space, that the fixture needs to be asymmetrical as well. In my mind the space can become one of the most dynamic spaces in the house. And rightfully so since it’s the main traffic corridor. It’ll be some time before we redo the lighting up there, including adding track lighting for the gallery wall, but it’s never to early to plan and dream. I’m even knocking around the idea of a spiral staircase to the loft, but the will be way down the road.

Alright, I think that brings us up to speed. Hopefully my studio shelves will be done soon so we can start installing them. Which in turn will help us get organized both in the studio and in the basement, which currently houses all of my art business junk.

We’ve kicked out a few monkeys.  This is good.

Random Thursday Update

I have yet to move my office back downstairs. They finished my studio floor last week, so the room isn’t closed off anymore…I can go back now. But I kind of like it up here in the loft.  The only downside is it gets kind of warm up here in the afternoon. It’s so high up that the HVAC system has trouble getting cool air up here to replace all the hot air that collects in the room at the top of the house. And lately it’s been so hot and humid outside that opening the windows doesn’t really do anything during the day.  Pondering this though, maybe that will be a good thing in the winter time when it’s cold in my office / studio.

The room is a really nice space. I could definitely see a desk up here and a little sitting area. And it’s location means that my family has difficulty finding me at times which is always a plus. The last two days, I’ve turned on to watching the yellow birds fly around the front yard. I hadn’t noticed them before but they look to be having so much fun out there. They love our black gum trees.  Makes getting anything accomplished more of a challenge than it really needs to be. Would be fun to be a bird for a bit. Oh well, I’ll move back downstairs sooner or later.

Now that the laundry room cabinets are in as well as the sink we can finally put everything in its place. Her new organizing book in hand, the wife has been awesome organizing things in there. She brought up 6 boxes from our ramshackle mess of a basement and was able to finally put stuff away. I helped out. We actually threw stuff out, created a box for donation and one box…well…that was for junk that didn’t need to be in the laundry room but weren’t sure where so it’ll go back in the basement.  Next up will be the linen closet and all the office junk drawers.  Rome wasn’t built in a day so to speak but every little bit counts. We should be organized completely on or about the day they put our ashes in an urn. Which is a vast scheduling improvement compared to where we were just a few months ago.

Outside the yard has gone to complete shit.  I can’t remember the last time we were out there. The weeds are loving it and the veggie garden is all but abandoned. Bees?  Oh yeah we should check on the bees. This weekend we’ll strike back and try to wrap up some things out there….finish the front bed, mount bat houses, turn a blind eye to the back yard and even cut the grass. Bees will get their time in the spotlight this afternoon. Hopefully they’re filling the upper frames. If so we can may just eek out a jar of honey before season’s end.

One thing that did get fixed outside is a broken spigot on the back of the house. Now we have a fancy new 1/4 turn spigot that works great. I’ll have to take a pic and share the info with you when I get a chance. With that I think ALL the plumbing stuff is added / fixed that was on the list other than the master bath sinks which are still broke – their water stops rendered useless. One thing our plumber pointed out was we have a push button water stop in the half bath. Very cool and I didn’t even know we had that. That may be a solution for our master bath, but would involve buying new drain hardware. Not that important right now. And I’m still waiting to hear back from our other plumber on the status of fixing the water stops on the Master Bath Kohler faucets. You’d think $700 faucets would be a little better quality but I guess not. They’ve been looking into a solution for the last 4 months so I’ll give it a few more months before I blow my brains out.

Speaking of blowing my brains out, Whirlpool claims that they’ll just credit me for the 4-way dryer vent that I didn’t need and wanted to return. I don’t have to return the vent kit. So if anyone wants a 4-way dryer vent kit, let me know. It’s worth $50.  That only took 3 months to resolve…or at least claim that there is a resolution in the works. Customer service is clearly dead across the board. Take what they give you and smile cause this is as good as it gets.

I’m battling a painting in my studio and it’s winning. Looks like garbage on canvas, but I’ll rescue it. It’s a commissioned piece so hopefully my buyer likes it in the end. Work has been hit and miss but we’re not starving just yet. I think we’re done with house projects or at least the expenditures for a while…need to get out there and finish these projects actually. We’ve got gallons of paint, boards of wood and whatnot waiting to be added to the house. Just need to get ‘er done. Fragmented days add to the excitement but also the feeling of living life on a treadmill.

Enough of my ramblings, I’ve got a painting to go battle in my studio.

Sunflowers are just so cool. I wonder when we can harvest sunflower seeds....

Sunflowers are just so cool. I wonder when we can harvest sunflower seeds….

Something ate our watermelon.  They didn't like the seeds though. Our veggie garden is in such disarray I've been chucking stuff over the fence when no one is looking. If I see one more zucchini I'm gonna puke.

Something ate our watermelon. They didn’t like the seeds though. Our veggie garden is in such disarray I’ve been chucking stuff over the fence when no one is looking. If I see one more zucchini I’m gonna puke.

Plumbing Day

Today we knocked some more things off of the list. Our plumber came over and installed sinks in the laundry room and studio. Before he could do that though we installed the new counter tops in each room. We measured the sinks and cut out the rough openings with a jig saw. We then attached the counters with a screw through the corner cleats in the base cabinets.  Once the counters were in place installing the sinks didn’t take too long.

We also had the plumber raise the hot and cold water outlets for the washing machine in the laundry room. This will allow us to turn off the water in case of an emergency without having to move the washing machine out from under, the yet to be installed, counter top. We decided to leave the electrical outlet above the future counter too in case we ever want to use it to plug in an iron or crafting tool. By the way, the washer weighs a ton so when we do the counter top over it, we’ll make the counter removable. That’s the only way to man handle the washer in and out; if the counter isn’t in the way. One last thing, we’ll just cut holes in the counter for all the hoses and power cord from the washer. It’ll look fine.

Now I just have to patch up the drywall in the laundry room and that project should be done for now.

laundry sink faucet includes a sprayer which will be good for cleaning the litter box.

laundry sink faucet includes a sprayer which will be good for cleaning the litter box.

Our linen patterned laminate top with the sink installed.

Our linen patterned laminate top with the sink installed.

We moved the washer shut off box up to clear the counter top we'll install above the washer at a later date.  Now on my to do list is fix the drywall.

We moved the washer shut off box up to clear the counter top we’ll install above the washer at a later date. Now on my to do list is fix the drywall.

My studio faucet is just a simple bar faucet.

My studio faucet is just a simple bar faucet.

Now I can clean brushes in my art studio.

Now I can clean brushes in my art studio.

Today's vegetables picked from our garden - we made big salads for dinner tonight. Yummy.

Today’s vegetables picked from our garden – we made big salads for dinner tonight. Yummy.

Home Alone

This is my bachelor weekend.  The wife and kids left to go visit her sister so here I am left all to myself. As anyone who has a family and hectic lifestyle knows, being alone for an hour, let alone two days, takes an act of congress. I’m not sure I’ve been alone in the last four years. And frankly it’s not all it’s cracked up to be really. The life is kind of gone out of the house with just me and the cat here. I had grand plans to get all kinds of things off of my “to do” list but in reality I’ve accomplished very little.  I guess I’m finding value in the freedom that accompanies not doing anything constructive. Which if you know me is also an extraordinary feat: doing nothing. Eating unhealthily, watching non-family friendly movies (e.g. Django Unchained) and playing video games is about all I’ve done.

One thing I knocked off the list was going out and finding sinks for the laundry room and my studio.  Finishing both rooms is contingent on getting the sinks installed next so it is imperative that I picked out a couple sinks. So after sleeping in until 9:45am this morning (which I haven’t done in over a decade) I contemplated what to do with my day, and decided to drive up to an area plumbing supply showroom. I had previously struck out when looking for sinks at Home Depot and Lowes. Looking online was daunting and would require a long wait for sinks to be shipped out. So I took a chance by hopping in the Rabbit and seeing what I might find at Welker McKee.  After waiting a while a nice sales woman helped me pick out the perfect, simple white sinks made by Mustee.  One sink is sized for our 30″ laundry cabinet, and the other for the 24″ cabinet in my studio.  They are simple fiberglass construction and they do not have faucet holes in them. I’m assuming my plumber can cut the holes for the faucets. And yes, I still need to pick out faucets for each. I think the sinks are a deal at about $70 each, and both were in stock so we’re back in business. Just need to get my studio floor finished (I have to remove the cabinet to finish the floor) and get the laundry counter made. Then I can get the plumber out to hook them up.

Other than my sink buying adventure I’ve done pretty much nothing. No bat house has been erected, and the upstairs gallery wall remains unpainted.  No yard work (though maybe water the plants like I was supposed to do yesterday), and no design work.  There are a ton of things that should or could be done but you know what? I don’t really care today. I need a mental health day to be lazy. Although I am working on a painting for a client of mine here and there today, so that kind of keeps the ‘not working’ guilt at bay a little bit. Maybe tomorrow can be bat house day. So here’s to random ‘lost’ Saturdays devoid of work or play.  And to Sundays when your family comes back home.